Search Results -- 1 sites found

Agency code = usgs
site_no list =
  • 393505077573601
Minimum number of levels = 1
Save file of selected sites to local disk for future upload

USGS 393505077573601 Ber-0662

Berkeley County, West Virginia
Latitude  39°35'05.22", Longitude  77°57'35.77" NAD83
Land-surface elevation 425.00 feet above NGVD29
The depth of the well is 146.00 feet below land surface.
The depth of the hole is 146.00 feet below land surface.
This well is completed in the Valley and Ridge aquifers (N500VLYRDG) national aquifer.
This well is completed in the Elbrook Formation (374ELBK) local aquifer.
Output formats
Table of data
Tab-separated data
Graph of data
Reselect period
Date Time
?
 
Water-level
date-time
accuracy
?
 
Parameter
code
Water
level,
feet
below
land
surface
Water
level,
feet
above
specific
vertical
datum
Referenced
vertical
datum
?
 
Status
?
 
Method of
measurement
?
 
Measuring
agency
?
 
Source of
measurement
?
 
Water-level
approval
status
2000-03-3114:00 UTCm62610 403.25NGVD29PTUSGSSA
2000-03-3114:00 UTCm62611 402.58NAVD88PTUSGSSA
2000-03-3114:00 UTCm7201921.75  PTUSGSSA
2004-03-1714:25 UTCm62610 404.27NGVD291TUSGSSA
2004-03-1714:25 UTCm62611 403.60NAVD881TUSGSSA
2004-03-1714:25 UTCm7201920.73  1TUSGSSA

Explanation
SectionCodeDescription
Water-level date-time accuracymDate is accurate to the Minute
Parameter code62610Groundwater level above NGVD 1929, feet
Parameter code62611Groundwater level above NAVD 1988, feet
Parameter code72019Depth to water level, feet below land surface
Referenced vertical datumNAVD88North American Vertical Datum of 1988
Referenced vertical datumNGVD29National Geodetic Vertical Datum of 1929
Status1Static
StatusPWater level was affected by pumping at the time of the measurement
Method of measurementTElectric-tape measurement.
Measuring agencyUSGSU.S. Geological Survey
Source of measurementSMeasured by personnel of reporting agency.
Water-level approval statusAApproved for publication -- Processing and review completed.